January 8, 2007 at 11:44 am | In My Project | Leave a CommentActual implementation has begun! Going along quite well. Having a design to work from is really helping me avoid stupid mistakes from the get go.
Items to Accomplish / Percent Complete
- Choose Platform: 100% (Done)
- Setup Platform: 100%
- Choose libraries: 95% —
- Integrate libraries into project: 65% — Most libraries are currently in use, one still needs to be integrated.
- Program base algorithm: 65% — Methods are in place, and most of the program logic is there.
- Choose test case: 45% — About half the test cases have been decided upon.
- Program test case: 5% — Stubs in place to latch on to for performing tests.
- Choose performance measurement tool: 15% — Additional research has been performed.
- Integrate performance measurements: 0%